Powering Togo’s Future with Renewable Solar Solutions

Country or Region Overview

Country or Region: Togo

Capital: Lomé

Total Population: Around 9 million (as of 2025)

Geographical Location: Situated in West Africa, Togo is a narrow strip bordered by Ghana to the west, Benin to the east, Burkina Faso to the north, and the Atlantic Ocean’s Gulf of Guinea to the south. Its terrain stretches from coastal plains to rolling savannahs and low northern hills.

Solar resource map copyright at 2021 Solargis. Licensed under the Creative Commons Attribution license (CC BY-SA 4.0). This is a solar resource map from Solargis. For a higher resolution map, please visit and download.

Table of Contents

Solar Irradiation Data in Togo

Togo enjoys strong solar potential, with an annual average solar irradiation of 4.5 kWh/m²/day to 5.5 kWh/m²/day. The sun-rich south and central savannahs, especially around Lomé and Sokodé, make it ripe for solar growth in a region hungry for power.

Key Solar Irradiation Data:

  • Annual Solar Irradiation: 5.0 kWh/m²/day nationwide average
  • High Irradiation Regions: Atacora and Savanes, peaking at 5.2 to 5.5 kWh/m²/day
  • Peak Irradiation: Up to 5.5 kWh/m²/day in dry seasons (November to March)
    Togo’s solar capacity reached 100 MW by 2024, boosted by the 50 MW Blitta Solar Plant, West Africa’s largest when launched in 2021. Aiming for 50% renewable energy by 2025 and universal access by 2030 under its National Electrification Strategy, Togo is lighting up its rural heart.

If you need to learn more solar power potential in Togo, please feel free to contact Solarvance for more details.

Temperature Factors in Togo

  • Average Annual Temperature: Togo’s tropical climate averages 25°C to 32°C (77°F to 90°F) in the south, cooling slightly to 20°C to 30°C (68°F to 86°F) in the north. Dry season peaks can hit 35°C (95°F).
  • Impact on Solar Panels: Steady heat trims efficiency a bit, though abundant sunlight compensates. Northern coolness offers a slight edge, with no frost to worry about.
  • Recommendation: Southern systems need heat-durable panels (e.g., monocrystalline), while northern setups thrive with standard designs. Ventilation aids all regions.

Energy Demand and Grid Situation in Togo

  • National Energy Demand: Togo consumes about 1.5 TWh yearly, driven by urban growth, small industries, and rural needs. Biomass dominates, but solar’s share rose to 5% in 2024, spurred by grid gaps and import reliance on Ghana.
  • Grid Infrastructure: The Compagnie Énergie Électrique du Togo (CEET) serves urban zones, but only 35% of Togolese had power in 2024, with rural access at 7%. Solar’s 50 MW of off-grid systems lights up villages, backed by $50 million in upgrades for universal reach by 2030.
  • Opportunities from Global Events: Togo’s role in ECOWAS energy talks and rural solar showcases could draw funds for off-grid expansion and agro-solar projects.

Preferred System Type in Togo

  • Grid-Connected Systems: Lomé and Kara tap grid-tied solar, where net billing (via CEET) credits excess power, cutting urban bills.
  • Off-Grid Systems: Rural Savanes and Maritime zones rely on standalone solar with batteries (e.g., 1-2 kWh), powering homes and clinics beyond the grid.
  • Hybrid Systems: Small farms and coastal hubs blend solar with diesel, ensuring steady juice through rainy spells or peak loads.

Dust and Sand Factor in Togo

  • Dust and Sandstorms: Dry season harmattan winds from the Sahara dust up central plains, while coastal rains keep it low. Urban smog in Lomé adds a light film.
  • Recommendation: Central panels benefit from tilted mounts and occasional wipes. Coastal systems lean on rain, needing minimal dust tech.

Humidity and Rainfall (Humidity Factor) in Togo

  • Humidity Levels: Coastal south averages 70% to 90%, northern savannahs drop to 40% to 60%. Rainfall ranges from 800 mm/year in the north to 1,400 mm/year in the south.
  • Impact on Solar Panels: Southern humidity tests seals, but modern builds hold. Rain cleans panels but clouds output in wet seasons (April to October).
  • Recommendation: Southern systems need watertight designs and storm-proof mounts. Northern panels focus on heat, dodging humidity woes.

Ocean (Salt Corrosion Factor) in Togo

  • Saltwater Corrosion: Togo’s 56 km Gulf of Guinea coast exposes Lomé and half its people to salty air, challenging solar near the shore.
  • Recommendation: Coastal setups require salt-resistant frames and coatings, with rinses to fend off wear. Inland savannahs skip this hurdle.

Government Policies and Solar Incentives in Togo

Togo’s solar push glows with smart policies:

  • National Electrification Strategy: Targets 50% renewables by 2025, with Project CIZO distributing 134,000 solar kits by 2023, aiming for 550,000 by 2030.
  • Tax Breaks: Duty-free solar imports spark 20 MW of yearly growth.
  • Donor Funds: $32 million from the African Development Bank and EU fuels off-grid solar, eyeing 600,000 homes.
    These moves blend Togo’s sun with its rural reach, aiming for full power by 2030.

ROI on Solar Systems in Togo

  • ROI Period: Solar pays off in 4 to 7 years, with sunny south hitting 4 to 5 years and northern rains stretching to 6 to 7 years, lifted by $0.15/kWh rates and diesel cuts.
  • Long-Term Savings: Over 25 years, savings hit 60% to 80%, with homes saving $100-$300 yearly and off-grid users slashing fuel costs.

Conclusion on Solar Power in Togo

Togo’s vibrant sun, rural soul, and bold green leap make it a solar frontier. From Blitta’s plains to Lomé’s coast, it’s wiring a nation with light.
Villagers, traders, and visionaries—Togo’s solar surge is your chance to plug in. Solarvance crafts the gear to power your Togolese tomorrow. Reach out today to join Togo’s bright ascent.

Choose Solarvance for Your Solar System

Contact us today to explore customized solar solutions for your needs, whether you’re interested in grid-connected, off-grid, or hybrid solar systems. Our team at Solarvance is here to guide you through every step of the process, from system design to installation and maintenance.

Nederlands (Formeel)